<-HOME

AUGUST 2010

BACKGROUND

JULY 2008

AUGUST 2008

NOVEMBER 2008

APRIL 2009

MAY 2009

SEPTEMBER 2009

OCTOBER 2009

NOVEMBER 2009

DECEMBER 2009

FEBRUARY 2010

MARCH 2010

APRIL 2010

MAY 2010

JUNE 2010

JULY 2010

AUGUST 2010

SEPTEMBER 2010

OCTOBER 2010

NOVEMBER 2010

Finished p-clipping main fuel line at back.
Fuel system now complete as far as engine bay.
rear fuel line 1 rear fuel line 2
Front brake lines bent to shape and p-clipped to chassis.
front brake lines 1 front brake lines 2 front brake lines 3
Trial-fitted handbrake lever.
As a result, slightly modified route of main brake line to give adequate clearance.
Handbrake lever
Wiring loom laid out in approximate location on chassis. Using wiring diagrams (and ?intelligent? guesswork) most connectors provisionally identified and labelled using bits of masking tape. Will check later using multimeter before loosely positioning using cable ties.
front wiring loom dash area wiring loom rear wiring loom
Separated bell housing from gearbox before thorough degreasing both, ready for inspection.
Plan to paint bell housing same colour as engine block.
Bell housing Gearbox