Finished p-clipping main fuel line at back.
Fuel system now complete as far as engine bay.
|
|
Front brake lines bent to shape and p-clipped to chassis.
|
Trial-fitted handbrake lever.
As a result, slightly modified route of main brake line to give adequate clearance.
|
|
Wiring loom laid out in approximate location on chassis.
Using wiring diagrams (and ?intelligent? guesswork) most connectors provisionally identified
and labelled using bits of masking tape.
Will check later using multimeter before loosely positioning using cable ties.
|
Separated bell housing from gearbox before thorough degreasing both, ready for inspection.
Plan to paint bell housing same colour as engine block.
|
|